ROBERT BOSCH
Electrical installations, Voice-data networks, Security systems
Jucu CLUJ (2013, 2016, 2018)
- built area 33,000 sq m + production hall with annex buildings
- execution period 8 months
- electrical installations (installed power of the site 9MW)
- voice-data network over 2000 ports
- low current installations (fire detection, access control)
